Bench & Gauge

Photos from current listings. Actual item, color, and included accessories may vary.

Westinghouse WATTHOUR METER Buying Guide

A Westinghouse watthour meter is an electromechanical induction kWh meter used to measure AC energy consumption, most commonly the Type D4/D5 single-phase 240V residential form. The primary trade-off is calibrated accuracy and service life versus obsolete analog architecture, since these meters are no longer the utility-standard for new revenue metering. Buy a tested, calibrated D4/D5 with known register ratio for legacy replacement or submetering; skip untested pulls if you need revenue-grade accuracy.

Meter Type:Electromechanical induction, single-phaseVoltage / Frequency:240V AC, 60 HzCurrent Class:Up to 200A continuousRegister Type:Analog dial or odometer, kWh
Typical price range$27.99

Key takeaways

  • Westinghouse D4/D5 watthour meters are 2-wire single-phase 240V induction meters with a 200A class rating and 3-wire (3W) or 2-wire configurations.
  • Induction disk meters use a voltage coil and current coil driving an aluminum disk; accuracy class is typically ±1-2% at calibrated load, degrading with age and bearing wear.
  • Analog dial or odometer registers read directly in kWh; the multiplier is set by the register ratio and CT/PT ratios when used with instrument transformers.

At a glance

Category
Industrial Gauges & Meters
Status
Listings available
Last updated
Nov 27, 2026

Current offers

Highlights

  • Westinghouse D4/D5 watthour meters are 2-wire single-phase 240V induction meters with a 200A class rating and 3-wire (3W) or 2-wire configurations.
  • Induction disk meters use a voltage coil and current coil driving an aluminum disk; accuracy class is typically ±1-2% at calibrated load, degrading with age and bearing wear.
  • Analog dial or odometer registers read directly in kWh; the multiplier is set by the register ratio and CT/PT ratios when used with instrument transformers.
  • Type D4 and D5 differ mainly in housing and register design generations; both are 60 Hz AC devices and are not rated for DC or 50 Hz service without recalibration.

Best use cases

  • Best fit: replacing a failed 240V single-phase watthour meter in an existing residential service panel where the utility has already approved a customer-owned meter.
  • Best fit: submetering a single 240V branch (tenant, shop, or outbuilding) at 200A or less where ±1-2% accuracy is acceptable and a mechanical kWh register is preferred.
  • Wrong fit: revenue billing requiring utility-grade accuracy or smart-meter features (time-of-use, demand, remote read) — use a solid-state ANSI C12.20 meter instead.
  • Wrong fit: 3-phase or 480V industrial services — D4/D5 single-phase units will not meter polyphase loads and must be replaced with a 3-phase form.

Buying tips

  • Match the meter form to the service: 2-wire 240V single-phase for typical residential; confirm 3W only if your panel provides a neutral for line-to-neutral metering.
  • Confirm the current class (e.g., 200A) exceeds your service disconnect rating — undersizing the meter class risks overheating and inaccurate registration at high load.
  • Verify the register ratio and multiplier before installing; a meter with the wrong register will read kWh incorrectly even if the disk spins properly.
  • Prefer tested, calibrated units with intact seals and no disk drag or bearing noise; an untested pull may spin slow or fast and cannot be trusted for billing.

Specs

Meter TypeElectromechanical induction, single-phase
Voltage / Frequency240V AC, 60 Hz
Current ClassUp to 200A continuous
Register TypeAnalog dial or odometer, kWh

Alternatives to compare

Related searches

What to check before buying

  • Measure your panel voltage and phase configuration: confirm 120/240V single-phase, 60 Hz, and whether a neutral is present for 3W metering.
  • Check the meter socket type and blade configuration (e.g., 4-jaw or 5-jaw) matches the D4/D5 base before purchase.
  • Confirm the service amperage (100A, 150A, 200A) does not exceed the meter's class rating and that the socket wiring is rated for the same.
  • Inspect the meter's register dial/odometer and multiplier, and confirm the utility or AHJ accepts customer-owned electromechanical meters for your application.

FAQ

All Industrial Gauges & Meters buying guides

Data sources: eBay / Amazon listings and product attribute feeds. Updated Nov 27, 2026.

Some links on this page are affiliate links. If you buy after clicking one, we may earn a commission at no extra cost to you. This does not change which products appear here or their order. Affiliate disclosure.